After over three weeks of seemingly nothing happening on our house, we have movement! YAY!
Apparently the insulators were the sticking point, getting behind on schedule and holding us up. While they were elsewhere, they did do work – it just wasn’t highly visible work – they did frame in our fireplace and build some more of the deck and got everything READY for drywalling.
But finally, after my threats to go in there and do it my own self, it is happening!! It is always amazing to me what the pros can get done in about a day’s time – like rocking most of an entire house. Despite how this photo looks, almost everything is done. And I’m sure what’s not done – namely one of the kids’ rooms and the office – will be done by the end of today.
Outside, the decorative masonry is going up as well and they have built the forms to pour our front walkway. It will be lovely to not have to walk on uneven ground littered with the (frequently sharp!) detritus of construction. It is full speed ahead on all fronts.
And that makes us pretty ham dappy!
Almost home!